Registration status
unregistered
Service life of IP, years
50
IP number in the register
23
Status of the IPs
Greenfield
Date of registration
15.06.2017
Empty plot area
46.4 ha
Initiator
Novorozdil City Council
Occupied plot area
0 ha
Data collection date
30.01.2025
UTILITIES: electric supply
Power lines are 110 and 35 kV on the site. 2 transformer substations 20+6.3 MW are located 200 m from the border
UTILITIES: water supply
Water supply is 176 m3/24 hours (domestic consumption) and 20 l/sec. (fire fighting). Tank is 3000 m3.
UTILITIES: gas supply
2 gas pipeline lines: 28 atm. (high pressure) and 10 (medium pressure)
UTILITIES: compressed air
no
Management company
CONSORTIUM CENTRE OF INVESTMENT AND INDUSTRIAL DEVELOPMENT
IP requirements on size and sector of enterprises
Production of eco-savings materials, products and technologies
IP management (name, position, mob.phone, email)
Volodymyr Tuz
Director of MC