Registration status
registered
Service life of IP, years
50
IP number in the register
3
Status of the IPs
Greenfield
Date of registration
07.02.2014
Empty plot area
20.6 ha
Initiator
L'viv City Council
IP layout
see Annex 1, IP 19
Occupied plot area
2.8 ha
Number of manufacturing companies operating at IP
0
Data collection date
19.06.2022
UTILITIES: electric supply
Transformer substation is 10 MW. The capacity is free, 630 kW is allocated for construction needs.
UTILITIES: water supply
Main city network is Ø 300mm - 600m from the site's boundary. 1st stage of construction has been connected to supply.
UTILITIES: sewage
The main urban network with a diameter of 200 mm runs at a distance of 530 m from the site boundary, the 1st stage of construction has been connected
UTILITIES: gas supply
High-pressure network Ø400 mm, at a distance of 900 m from the border. Gas reducing point is under construction
UTILITIES: compressed air
n.a.
Management company
"CityPark Lviv" LLC
IP requirements on size and sector of enterprises
Production of IV and V classes of consequences with sanitary protection zones of 50 m and 100 m, respectively. Priority areas of activity: - Instrument and mechanical engineering; - Wood and metal processing; - Light and food industry; - Production of electrical, electronic and optical equipment; - Transport and logistics.
IP management (name, position, mob.phone, email)
Mykhailo Sakun
investment director