Registration status
unregistered
Service life of IP, years
50
Status of the IPs
Greenfield
Empty plot area
10 ha
Initiator
ROZNAI Ivan Yuriyovych
Number of manufacturing companies operating at IP
2
Data collection date
30.01.2025
UTILITIES: electric supply
Power supply source: Connection to the centralized power grid (___ kV). Use of alternative energy sources: Solar power plants (planned capacity – ___ MW). Wind power plants (planned capacity – ___ MW). Biogas plants for the combined production of heat and electricity. Backup power: Diesel/gas generators for emergency backup. Battery Energy Storage System.
UTILITIES: water supply
Source of water supply: alternative (artesian wells). Supply volume: ___ m³/day. The possibility of using a rainwater collection and purification system.
UTILITIES: sewage
Local sewage treatment plants for industrial enterprises. Possibility of reuse of treated effluents in production processes.
UTILITIES: gas supply
Access to the gas network (medium pressure). Use of biogas technologies and alternative fuels to minimize the impact on the environment.
UTILITIES: compressed air
System of centralized supply of compressed air for production enterprises. Energy-efficient compressor stations with heat recovery systems.
IP requirements on size and sector of enterprises
Priority industries: green energy, ecologically clean production, processing of secondary raw materials, woodworking, agroprocessing, biotechnology. Enterprise size: small, medium and large manufacturing companies. Mandatory compliance with environmental standards, resource-efficient production and circular economy principles.
IP management (name, position, mob.phone, email)
ROZNAI Ivan Yuriyovych
Byshiv village head